Management of Causes and Impacts of Design Changes in Ethiopian Building Projects; The Case of Arsi Zone Public Building Construction Projects
Loading...
Date
2022-09
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
ASTU
Abstract
The purpose of this study is to investigate causes and impacts of design change in public
buildings and Management of Causes and Impacts of Design Changes in Arsi Zone. In this
study data collection tools were questionnaires, case study and group discussion on sample
public building projects. From 64 questionnaires distributed, 58 were responded with
response rate of 90.6%. The data were analyzed by using SPSS software version 25 and the
Relative Importance Index (RII). The results revealed various factors that lead to design
change in public building construction projects, such as; Additions of new works at the
request of the client, Poor coordination and communication between parties, Design Errors,
Willingness to use alternative materials, The desire of the contractor to improve his financial
situation, Inconsistency of the contractual document, Unexpected site conditions and Design
change made by consultants. From the results of RII analysis the impacts of design change on
overall performance of construction projects, such as Delay of the projects, suspension of the
projects and Increase of project cost. The Selected Current Design Change Management
practice discussed are involvement of experienced technical personnel, involvement of end
users before starting of the construction and ensure sufficient budget for the project also the
Result also shows that the parameters used to develop the design change management
system flowchart such as Proper supervision, involvement of end users at Design Stage,
involving design team in construction process, and developing professional skill of design
team were very important to develop the best design change management system flowchart.
The study address the management of causes and impacts of design change in public building
projects, the researcher creates a management system flowchart as a mitigation measures. The
study concludes that paying a serious attention to the major causes of design change will be
very important to manage the impacts and finally achieve the goals of project. The researcher
recommend that always work to identify major causes of design change and properly manage
the impacts of the design change happened at any time. And the researcher recommends
studying on the wider area and including more construction projects for further study.
Description
Keywords
Design change, Design Change management, Public building projects, Arsi Zone