?�?Productivity Oriented Assembly Line Balancing for Manufacturing of School Bus: A Case of Bishoftu Automotive Industry

dc.contributor.advisorKassu Jilcha (Ass. prof)
dc.contributor.authorKibrom, Hailemariam
dc.date.accessioned2025-12-17T11:20:03Z
dc.date.issued2018-09
dc.description.abstractThis Paper Addresses About Snags Of Productivity Oriented Alb Of Bishotu Automotive Industry (Bai) With Respect To Their Corresponding Solutions; Which The Case Of Related Domain School Bus Manufacturing Industries Is Also. Though Several Researches Concerning Alb Has Been Presented, There Were So Many Constraints Regarding How To Innovate Concrete Alb System Of Manufacturing Yet. For That Motive, This Research, Which Was The Occasion Of Bishoftu Automotive Industry Had Come In To The Front. The Principal Target Of This Research Was To Improve Productivity Rate Oriented Assembly Line Balancing For Manufacturing Industries Which Was A Case Of Bishoftu Automotive Industry In Depth With Bus Production Factory Of The Case Company. Hence, The Importance Of The Thesis Was To Advance Both Continuous Improvement On Customers?�? Satisfaction, As Well As Comprehensive Reduction Of Production Time And Cost Of The Company; Besides, Other Related Manufacturing Industries. From All Stations Of The Case Company Primary And Secondary Data, The Research Analysis Was Done Using Simple Mathematical Model With The Help Of Heuristic Methods And Grouping Comparable Parallel Work Processes Technology Transfer System. Primarily, The Company Was Providing Only Two Busses Per Day; Now, Detail Analysis Of The Paper Resulted On 4.52 Buses That Is Highly (77.55%) Efficient Than The Former Investigations. Global Discussion And Results Of The Profound Method Displays, It Is Bright To Avail A Drastic Modification (Birr 487,628 Profit Per Day) Of Availability On Productivity Rate Of The Case Company. This Value Was Grown By Minimizing The Working Cycle Time Into 3.5226 Hours To Produce One Bus Per Day. Productivity Oriented Alb Can Be Promoted By The Pre Stated Techniques. Subsequently, It Is Better To Introduce The Upshot Of This Exploration Even For Companies Other Than Bishoftu Automotive Industry Throughout The World.en_US
dc.description.sponsorshipASTUen_US
dc.identifier.urihttp://10.240.1.28:4000/handle/123456789/2551
dc.language.isoenen_US
dc.publisherASTUen_US
dc.title?�?Productivity Oriented Assembly Line Balancing for Manufacturing of School Bus: A Case of Bishoftu Automotive Industryen_US
dc.title.alternativeA Case of Bishoftu Automotive Industryen_US
dc.typeThesisen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Kibrom Hailemariam Berihu.pdf
Size:
1.91 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Plain Text
Description:

Collections