Monitoring and Protection System for Automatic Load Sharing Power Transformer (Case Study: Tatek Transformer Factory)
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
ASTU
Abstract
The transformer needs fast protection as well as continuous monitoring since it is an
important electrical equipment as well as essential element for power system to perform
effectively. It operates for 24 hours of a day and feeds the load. The transformer damage
may occur when the load on the transformer is suddenly increased above its rated
capacity because of the growing demands of energy. When this situation occurs, the
transformer will be overloaded and overheated partial discharge and arc and may
damage the insulation of transformer resulting in interruption of supply. The best
solution to avoid the overloading is to operate the number of transformers in parallel. In
the suggested approach auxiliary transformer will share the load when the load on the
main transformer will rise above its rated capacity. The main aim of the work is also to
provide an un-interrupted power supply to the energy consumers (priority based). Fuzzy
logic is used for parallel operation of transformers. The problem of interruption of
supply due to transformer overloading or overheating can be avoided.