The challenges of providing satisfactory water supply to the rapidly growing populations in
developing countries are increasing over time. In Ethiopia, ensuring an adequate and reliable
water supply in rural areas has become a significant challenge for many water utilities.
Amereba Indato rural water supply system was constructed to give service for 162,519 people
living in 22 rural kebeles and 3 rural towns in Robe and Tane, Arsi Zone of Oromia Region.
However, the scheme is not performing efficiently according to the intended design capacity
and 5 kebeles in the distribution radius are not getting water. Hence, the objective of this study
was to identify the challenges of Amereba Indato rural water supply system and to propose
course of actions to improve system performance and service delivery. Water demand was
computed by using population projection and unit rate consumptions considering different
mode of service. Hydraulic analysis was conducted employing Water GEMS software to
evaluate the pressure and velocity of both transmission and distribution pipe lines. The result
shows that 85.32L/s maximum day demand (MDD) is required to address the water supply
coverage for the intended design period. With the existing sources spring and borehole was
30L/s and 120L/s capacity can be provided whereas the analysis shows that 36.58L/s capacity
is required indicating around the spring sources remain in deficits of 6.58L/s for area
supposed to be covered by the spring sources. Hydraulic analysis also shows that 22% of the
distribution lines were exposed to high pressure energy (80-181m), whereas, 21.05% of the
pipe has velocity less than the recommended 0.6 m/s, which might result in stagnant water
formation. The analyzed water losses result indicates that about 41.09% of production is non revenue water and 32.41% of non -revenue water is estimated as a real lose. The factors
associated to water loss were found to be community interest, problem at construction time,
illegal connection, and pressure. Thus, it is important to change the more pressurized pipes
from the distribution network and transmission pipe by providing pressure reducing valves in
the link having high pressure in distribution network. It is also important to give awareness for
the community and make a rehabilitation work to cause during construction phase in the area.
Finally, it is necessary for the water utility to give attention to water losses reduction policies
and strategies to minimize water loss in the rural